A sheet pile mooring cell at the confluence of the Ohio and Kentucky rivers had been damaged and required repair.
A power plant needed a firm to visually inspect and measure the thickness of deteriorating metal outfall lines
A local municipal utility was performing assessments on their sanitary collection system.
The energy plant client needed to service a water pump inside the pump basin.
A newly installed liner was leaking at several joints in a 72-inch diameter sewer line.
We were called to get inside multiple lines that had internal access through the plant’s condenser unit
Our client, a pork processing plant wastewater treatment facility, had an air leak in the manifold
Bulldog Diving was summoned to perform a Sheet Pile repair and mooring ring replacement on a mooring cell.
Bulldog Diving Inc. Makes Accurate Outfall Line Assessment Possible Under Challenging Conditions
An aging aerobic digester system had developed restricted airflow, causing low oxygenation numbers in the basin.
Bulldog Diving Inc. Tackles Challenging Large Sewer Line Assessment, Allowing Ohio Utility to Stay Current on CMOM program
Taking the Heat Off: Bulldog Diving Inc. Allows Energy Plant To Minimize Time Offline for Required Maintenance
Bulldog Diving Inc. Allows New Jersey Municipality To Minimize Time Offline for Required Maintenance
Bulldog Diving Inc. Effects Wastewater Treatment Plant Aeration Basin Manifold Air Leak for Iowa Pork Processing Plant